![]() Synchronization experience of Diesel Gen sets to diesel from 100KVA to 2.5 MW of Perkins, MITSHUBISHI, FG Wilson, by DSE (Deep Sea UK), ComAp Controllers.panels, ATS/AMF panels etc.) installation, erection, project management and commissioning. Specially of power generation sector (Substation, Synchronization, load sharing, load management, switchgear designing and manufacturing, sync. More than 7 years of Diesel Power Generation engineering, designing, erecting and commissioning experience.Prior to that, he worked as an Electrical Engineer in Standard Group for 4 long years. (Rahimafrooz Group) working as an Installation Engineer. Now he is in Rahimafrooz Energy Services Ltd. Professionally Masud Rana Rumon, an Electrical Engineer, has been working in various top companies efficiently for 8 long years.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |